29th January - Journal Constructing Excellence Column

29/1/2016

1 Comment

 
By James Ritchie Architect and RIBA Specialist Practice Consultant

If you are about to alter, extend or demolish a building or structure, or are thinking of putting up a new one, then you probably want it all to go smoothly.
As we all know, a project only goes well if it has been carefully planned, is well managed and monitored to see how it is progressing.
This applies to all aspects of a project not just the finance and programming. Success can be measured by how well project risks are identified, managed or eliminated. Time, cost and quality are becoming ever more important drivers for the success of construction projects, so the identification of risks from finance and planning permission to programming and health and safety are becoming more critical. A client that ignores consideration of such risks does so at their own peril.
The new Construction (Design and Management) Regulations 2015 go quite some way to helping clients deal with health and safety risk management as the commercial client duties are set out much clearer. The aim of the Regulations is to ensure clients give clear project leadership and consider health and safety risks as essential and integral parts of the planning and management of projects -not just ‘something the contractor has to deal with’.
There are great advantages for clients if they and everyone involved in the project, comply with the new CDM Regulations, such as improved planning and management ensuring the project is completed on time, within budget and to the required standards.
Clients should still be able to rely on those they appoint, but it must be recognised that clients hold the power to influence and control those they engage with or appoint on a project and therefore bear the ultimate responsibility for achieving a safe and healthy project. The success of the project is in their hands as much as those they appoint to design and construct the building.
For the management of health and safety risks, the age old adage that ‘perfect planning prevents poor performance’ has never been better suited. Failure to adequately manage these risks will at best, result in delays, extra costs on the project and possibly a Fee For Intervention bill from the Health and Safety Executive (HSE) and, at worst, leave the client in court facing the new Sentencing Guidelines for health and safety prosecutions.
If you aren’t sure what the financial implications are of the new Sentencing Guidelines, which come into force on 1 February this year, then I strongly advise you to speak to your legal advisers, and pronto at that!
CENE are running a seminar looking at the responsibilities of clients under CDM2015 regulations on 3 February 2016. To register for this event, please contact Leanne McAngus on 0191 500 7880 or [email protected]
1 Comment

Advice on CDM2015 and the new Domestic Client duties

7/8/2015

 
From 6th April 2015, a change in the Construction (Design & Management) Regulations means that, if the project is likely to involve more than one contractor, domestic clients now have a legal duty to appoint a competent Principal Designer to be in charge of planning, managing and monitoring the health and safety aspects of their project during the pre-construction phase. Clients also need to ensure that they appoint a Principal Contractor to plan, manage and monitor the construction phase of the project.


For the majority of domestic projects the most likely organisation to take on the Principal Designer role will be their architect or surveyor who is designing the scheme. The client needs to make sure that their designer has sufficient health and safety skills, knowledge and experience to discharge their legal duties satisfactorily and provide good advice to the client if required.


The good news for domestic clients is that their other client duties under the CDM2015 Regulations will automatically be the responsibility of the Principal Contractor to discharge on behalf of the client unless the client chooses to appoint their Principal Designer to undertake the client duties instead.

Confused? Then give James a call on 07785 915687.


Further clarification of these changes can also be obtained by contacting James Ritchie on [email protected].

    Author

    Write something about yourself. No need to be fancy, just an overview.

    Archives

    January 2016
    August 2015

    Categories

    All

    RSS Feed